November 26, 2019
70% of tunnelling for the Colaba-Bandra-SEEPZ Metro-3 corridor was achieved by the Mumbai Metro Rail Corporation (MMRC). Approximately, 23 breakthroughs were completed in two years, totalling 38.25 km out of 55 km. The first and only fully underground corridor to overhaul the deteriorating urban transport and chock-a-block traffic in the city is Colaba-Bandra-SEEPZ Metro-3. On […]
In two years, MMRC has completed 70% of the tunnelling for the Colaba-Bandra-SEEPZ Metro-3 route.more